Kastamonu Araç Dam

Kastamonu Araç Dam

Kastamonu Araç Dam is a project aimed at irrigation and energy production started with the contract dated 12 October 2015 with DSI. The tunnel length of the dam is 510 meters, Its height is 81.5 meters, Its crest length is 560 meters, and a total of 2 million cubic meters of excavation and 5 million cubic meters of filling will be done.