Bartın Barracks Flood Trap

Bartın Barracks Flood Trap

As a result of the contract with DSİ dated 6 February 2014, Bartın Barracks Flood Trap was started and built for flood control purposes, having a 191 metre long tunnel with a diameter of 4 metres. The construction of the project was completed on 28.09.2018 with a total of 351,000 cubic meters of excavation and 855,000 cubic meters of filling being completed and the height of the dam is 34 meters, the length of the dam crest is 205 meters.