As a result of the contract with DSİ dated 29 January 2014, the provisional acceptance process was completed on July 15, 2015, approximately 1 year prior to the projected period. The dam height of Gündoğmuş Sümeni Pond which was built with membrane covering for irrigation purposes is 21 meters, the crest length is 254 meters, a total of 347,000 cubic meters of excavation, 211,000 cubic meters of filling was made and 8 km of pipes were laid for irrigation.